The design stage is a process to complete the entire image of your home project, including architectural drawings, structures and more. This design process usually takes 2-4 weeks, depending on the number of revisions in it. The case often happens is the architect must change the concept because of the homeowner’s desire to change. In the meantime, if you want to hire the excellent architects near your area, just check out the Arquitectos en Tijuana.

Looking for a contractor

Architects can also help you get the right contractor. The reason, usually they have been connected to each other through previous development projects. This process can last for 1-2 weeks. In the meantime, you can start filing a Building Permit (IMB) letter with a working draw from the architect. If you do not want to be bothered, you can ask the contractor’s help to take care of it.

Development

This stage is the most exciting process because the architectural drawing will be built in the form of reality. After that, the renovation process can take 4-6 months, depending on the number of changes or the slow process. At this stage, between you and the architects need to provide integrated supervision. In case of errors, while building, you do not need to panic immediately. Changes or errors in development are common as long as everything can be fixed.

Retention period

Once the house is built, the contractor provides a 3-month repair warrant for renovation and building work. In the event of problems such as leaks, cracked cracks, and hinges jammed due to mismanagement, then you can file a claim.

Those are the last few steps that you must take before you hire a reliable architect. It’s true that it can be quite a complex list to do just to hire an architect, but it helps you to get the satisfying result for the design of your house.